If you're importing for the first time, this question decides everything else — your pricing, your stock levels, and what you promise your own customers.

The short answer: 15 to 25 days from the moment your shipment arrives at our China warehouse to the moment it reaches our Manila warehouse, under normal conditions. That window already includes consolidation, sailing time, and customs clearance on both sides.

What happens during those 15–25 days

Days 1–5 — Consolidation. Your goods sit at our China warehouse (Yiwu, Shishi, or Guangzhou) while we consolidate them with other shipments into a container. This is what makes LCL affordable — you pay for your share of the space, not the whole container.

Days 5–7 — Export clearance and loading. Formal export documentation and loading onto the vessel.

Days 7–18 — Ocean transit. The actual sailing time to Philippine ports.

Days 18–25 — Philippine customs and release. Import clearance, duties and taxes settled, then transfer to our Manila warehouse.

What makes it slower

Ordering for Christmas

October to December is the slowest stretch of the year. Three things stack up:

Working back from stock in hand by 1 December: your sea shipment should leave China by early November, so goods need to be at our China warehouse by late October. After about 15 November, plan on air freight (1–3 days), which works for top-ups until roughly mid-December. Selling at a Christmas bazaar? Move every date about two weeks earlier. The full timeline is in Christmas peak season: when to order from China.

When to use air freight instead

If 15–25 days doesn't work, air freight moves the same route in 1–3 days. It costs more per kilogram, but for samples, rush restocks, or high-value low-weight goods the maths often favours air. Minimum is 1 kg.

A practical rule: if the item is small, urgent, or worth far more than the freight cost, fly it. If it's bulky and you planned ahead, ship it. Compare the two for your own cartons in the shipping cost calculator.

How to plan your reorder point

That buffer is the difference between a stockout and a smooth quarter.

Frequently asked questions

How long does sea freight from China to the Philippines take?

15 to 25 days under normal conditions, counted from when your goods arrive at our China warehouse to when they reach our Manila warehouse. That includes consolidation, sailing and customs clearance on both sides.

Does the 15 to 25 days start when I place my order?

No. It starts when your supplier delivers to our China warehouse. Supplier production and delivery inside China usually add 1 to 3 weeks before that, depending on the product.

Is air freight faster?

Yes. Air takes 1 to 3 days from our China warehouse to Manila. It costs more per kilogram, so it suits samples, urgent restocks and small, high-value goods.

Will a sea shipment arrive before Christmas?

Only if it leaves China early enough. For stock in hand by 1 December, a sea shipment should leave China by early November, which means goods at our China warehouse by late October. After mid-November, plan on air freight, which works for top-ups until roughly mid-December.