Every December, the same message arrives in our inbox: "Kaya pa ba bago Pasko?" Usually the honest answer is no — because the decision that mattered was made in September. Here is the timeline that keeps your Christmas inventory out of that conversation.

The short answer: for sea freight, place your supplier orders by mid-September and get goods to the China warehouse by early October. For air freight, order by mid-November. Everything below explains why those dates are what they are.

Why Q4 is different from every other quarter

Three events stack on top of each other between October and December:

  1. Golden Week (first week of October). China's National Day holiday. Factories close for up to a week, and the pre-holiday rush plus post-holiday backlog effectively costs you two to three weeks if your order lands in the middle of it.
  2. 11.11 (Singles' Day). The biggest e-commerce event on earth. From late October, warehouses, trucking, and vessel space in China are flooded with 11.11 volume — your cargo is competing with all of it.
  3. Global Christmas demand. Every importer in every country is shipping at the same time. Vessel space tightens and transit times stretch toward the upper end of the normal 15–25 day range — and sometimes past it.

None of this is a crisis if you plan around it. All of it is a crisis if you order in November and hope.

The working-backwards math

Say you want stock in hand by December 1 — sensible if you're selling on Shopee, TikTok Shop, or at Christmas bazaars, because the selling peak is the first three weeks of December, not the 24th.

The one date to remember: if your supplier order isn't placed by September 20, your sea shipment is no longer "before Christmas" — it's "hopefully before Christmas."

Month-by-month plan

August (now) — decide and sample

Choose your Christmas products and order samples this week. A sample takes 1–2 weeks to reach you by air; you still have time to test quality and adjust before the bulk order. If you're still choosing what to sell, start with what actually sells from China.

September — place bulk orders

Confirm your supplier, place the full order, and instruct them to deliver to the Angkat warehouse with your client code on every box. Follow up weekly — September factories are busy, and quiet suppliers slip deadlines.

Early October — goods at the warehouse before Golden Week

Anything that misses the pre-Golden-Week window ships mid-October at the earliest. If a supplier can't commit to pre-holiday delivery, know that now, not on October 9.

Late October to November — sail, track, prepare to sell

Your shipment sails; track it in your Angkat Express account. Use the transit weeks to build your listings, shoot content, and schedule promos — the sellers who win December aren't photographing products on December 5.

November 15 onward — air freight territory

Missed the sea window? Air freight (5–7 days) can still save your season for small, high-value goods until roughly mid-December. It costs more per kilo, but a sold-out December pays for it; a stockroom of January arrivals doesn't.

Your dates at a glance

Working backward from stock-in-hand by December 1:

Selling at physical bazaars? Most Christmas bazaars start setup in early November — move every date above roughly two weeks earlier.

Three peak-season mistakes we see every year

  1. Ordering everything in one late shipment. Split your order: a September sea shipment for the core stock, a November air top-up for whatever's selling fastest. You'll read December demand with real data instead of guessing in September.
  2. Forgetting the December selling curve. Stock arriving December 20 misses the buying peak. Aim for December 1.
  3. Booking with whoever is cheapest in November. Peak season is when unreliable forwarders fail loudest. A shipment stuck in customs in December is a season lost.

Frequently asked questions

Is there a hard cutoff date for Christmas delivery?

There's no single official date — it depends on your product, supplier speed, and the week's congestion. The safe planning rule for 2026: supplier order by September 20 (sea) or November 15 (air). We'll publish updated cutoff guidance as December approaches.

Should I also plan for Chinese New Year now?

Yes — CNY 2027 lands in February, and factories close for roughly two weeks. January orders need the same working-backwards treatment. Read the CNY shipping guide.

What does peak-season shipping cost?

Angkat's all-in rates apply year-round — see the full cost guide. The real Q4 risk isn't the rate; it's the space. Book early.